TO THE OCCUPANTS OF BIOLOGICAL SCIENCES
Please note in preparation for the new buildings occupancy walkthrough on Wednesday, July 24th the project team will be performing a dry run the morning of Friday, July 19th.
The following will take place on both days:
- The generator will run as regular power to North and East is turned off,
- Fire bells will be ringing intermittently in ALL wings. NOTE: they will be silenced but due to their 1 minute delay you will hear them ringing approximately 10-15 times over a 4 hour period on BOTH days. Please do not be alarmed and treat this test as real fire alarm requiring evacuation.